Weis Engineering Ltd is one of the professional water borehole drilling companies in Uganda that brings a combination of hydro geologists, geologists, drilling engineers and technicians, water engineers to mention

We have worked on a number of drilling projects including;

  • Community water supply system,
  • Irrigation water supply,
  • Industrial use
  • Domestic use, to mention

We have worked in different regions of the country including the central, Eastern, Western, and Northern gaining more experience in handling different soil formations, and different rock types.

Listed below is some of our selected drilled water boreholes

Borehole drilling in Bugiri

Borehole details

ActivityHydrogeological surveyDrilling and sitingPump testingPumping system Installation(Hybrid)
ContractorWeis Engineering Weis EngineeringWeis EngineeringOn going
Borehole details Recommended drilling depth= up to 75 meters75 meters, open hole casingThree step tests
1.5m3/hr, 2.5m3/hr and 4.5m3/hr each one hour
Constant pumping for 24hrs at 4m3/hr
Recovery 96.1% in 1 hr

Borehole purpose

Some field photos

Short video

Borehole drilling in Kapeeka

Borehole details

ActivityHydrogeological surveyDrilling and sitingPump testingPumping system Installation(Hybrid)
ContractorWeis Engineering Weis EngineeringWeis EngineeringOn going
Borehole details Recommended drilling depth= up to 70 meters45 meters, closed hole casingThree step tests
7.5m3/hr, and 15m3/hr each one hour
Constant pumping for 24hrs at 10m3/hr
Recovery 94.17% in 1 hr

Borehole purpose

  • Community water supply (School, hospital and general community)

Some field photos

Short video

Borehole development
Drilling through boulder

Borehole drilling in Nakapiripit

Borehole details

ActivityDrilling and sitingPumptestingPump Installation
ContractorotherWeis EngineeringWeis Engineering
Borehole details Recommended drilling depth= up to 70 meters100 meters, open hole casingThree step tests
0.3m3/hr, 0.6m3/hr and 1.0m3/hr each one hour
Constant pumping for 12hrs at 0.5m3/hr
Recovery 96.1% in 1 hr

Borehole purpose

  • Provide water for community and basic industrial use

Some field photos

Short videos

Borehole drilling in Lwengo

Borehole details

ActivityHydrogeological surveyDrilling and sitingPumptestingPump Installation
ContractorWeis EngineeringWeis EngineeringWeis EngineeringWeis Engineering
Borehole detailsExpected yield = 2m3/hr, Expected drilling depth= up to 100 meters100 meters, full casingTwo Step tests
1.5m3/hr, 2.5m3/hr, and 4 m3/hr each one hour
Constant pumping for 72hrs at 2.0m3/hr
Recovery 99% in 1 hr
Hybrid (Uses both AC and DC, Multi-led digital pump inverter with remotely controlled function

Borehole purpose

  • Provide water for community (Institute)

Some field photos

Short video

Borehole drilling in Jinja

Borehole details

ActivityHydrogeological surveyDrilling and sitingPumptestingPump Installation
ContractorWeis EngineeringWeis EngineeringWeis Engineering
Borehole detailsExpected yield = 1m3/hr, Expected drilling depth= up to 70 meters60 meters, open hole casingTwo Step tests
1.1m3/hr for 1 hr, and 2.1m3/hr for 40 minutes)
Constant pumping for 24hrs at 1.3m3/hr
Recovery 96.1% in 1 hr

Borehole purpose

  • Provide water for domestic and basic irrigation

Some field photos

Borehole flushing demo videos

Borehole flushing 1
Borehole flushing 2

Borehole drilling in Wakiso

Borehole details

ActivityHydrogeological surveyDrilling and sitingPumptestingPump Installation
ContractorWeis EngineeringWeis EngineeringWeis Engineering
Borehole detailsExpected yield = 3m3/hr, Expected drilling depth= up to 85 meters70 meters, Full bottom casing to 65 metersFour step tests
1.5, 3m3/hr for 1hr and 4.3m3/hr for 3 mins.
Constant pumping for 24hrs at 2.5m3/hr
Recovery 98% in 55mins.

Borehole purpose

  • Provide water for school the community

Some field photos

Borehole drilling in Yumbe

Borehole details

ActivityHydrogeological surveyDrilling and sitingPumptestingPump Installation
ContractorWeis EngineeringWeis EngineeringWeis Engineering
Borehole detailsExpected yield = 2m3/hr, Expected drilling depth= up to 80 meters70 meters, open hole casingStep tests = 2 each 1.0hrs (1.53, & 2.04m3/hr)
Constant pumping for 24hrs at 1.2m3/hr
Recovery 98% in 1 hr

Borehole purpose

  • Provide water for Moslem community – prayers, school and the community

Some field photos


Borehole drilling in Kasanda

Borehole details

ActivityHydrogeological surveyDrilling and sitingPumptestingPump Installation
ContractorWeis EngineeringWeis EngineeringWeis Engineering
Borehole detailsExpected yield = 3m3/hr, Expected drilling depth= up to 120 meters70 meters, Full bottom casingStep tests = 5 each 1.5hrs (1.5, 2.5.3.5, 4.5 &5.5m3/hr)
Constant pumping for 24hrs at 4.5m3/hr
Recovery 91% in 1 hr

Borehole purpose

  • Basic industrial use
  • Basic irrigation water
  • Domestic use

Some field photos

Borehole drilling in Mubende

Borehole details

ActivityHydrogeological surveyDrilling and sitingPumptestingPump Installation
ContractorWeis EngineeringWeis EngineeringWeis EngineeringWeis Engineering
Borehole detailsExpected yield = 3m3/hr, Expected drilling depth= up to 120 meters77 meters, Open hole casingStep tests = 3 each 1.5hrs (2.5, 4.5, &6.5m3/hr)
Constant pumping for 72hrs at 3.3m3/hr
Recovery 99% in 1 hr
Grundfos SQfelx

Borehole purpose

  • Irrigation water for 2.2 acres

Some field photos

Borehole drilling in Kapeeka

Borehole details

ActivityHydrogeological surveyDrilling and sitingPumptestingPump Installation
ContractorWeis EngineeringWeis Engineeringon holdon hold
Borehole detailsExpected yield = 2m3/hr, Expected drilling depth= up to 85 meters70 meters, full bottom casingon holdon hold

Borehole purpose

  • 2 acres irrigation
  • Livestock
  • Domestic use

Some field photos


Borehole drilling in Pallisa

Borehole details

ActivityHydrogeological surveyDrilling and sitingPumptestingPump Installation
ContractorWeis EngineeringWeis EngineeringWeis Engineering pending
Borehole detailsExpected yield = 3.5m3/hr, Expected drilling depth= up to 75 meters75 meters,open hole 7.2m3/hrpending

Borehole purpose

  • Domestic use
  • Livestock
  • Irrigation

Some field photos

Demo video – Borehole flushing

Borehole flushing demo in Pallisa Uganda

Borehole drilling in Yumbe II

Borehole details

ActivityHydrogeological surveyDrilling and sitingPumptestingPump Installation
ContractorWeis EngineeringWeis EngineeringWeis Engineering pending
Borehole detailsExpected yield = 1.5m3/hr, Expected drilling depth= up to 65 meters65 meters,open hole 1.2m3/hrpending

Borehole purpose

  • Community water use

Some field photos

Borehole drilling in Serere

Borehole purpose

  • Domestic use and irrigation

Borehole details

ActivityHydrogeological surveyDrilling and sitingPumptestingPump Installation
ContractorWeis EngineeringWeis EngineeringWeis Engineering Weis Engineering
Borehole detailsExpected yield = 4m3/hr, Expected drilling depth= up to 70 meters50 meters, Full casing 6.8m3/hrOngoing(Solar powered)

Some field photos

Sample videos

Borehole drilling supervision in Ibanda 1

  • Cost of drilling a borehole in Uganda
  • Borehole drilling companies in Uganda
  • Uganda borehole drilling

Borehole drilling supervision in Ibanda 2

Borehole drilling supervision in Ibanda 3

Borehole drilling supervision in Ibanda 4

  • Water borehole drilling in Uganda
  • Borehole drilling in Uganda
  • Borehole drilling rig in Uganda
  • Installing temporary casing during borehole drilling